Case Study: On-Site Monitoring
Midland Catering - Location: Nottingham, UKMidland Catering
We were asked to provide monitoring on a brownfield site, situated on a former oil depot.
As part of our work, we installed new monitoring points as well as developing existing points which had silted up.
Groundwater was monitored with low-flow sampling techniques. In addition, we monitored and sampled soil vapours from the same wells.