Case Study: Geotechnical
Holbeam Dam - Location: Newton Abbott, Devon

Holbeam Dam

We performed a detailed geotechnical site investigation to enable the reconstruction of a flood relief dam.
Our work enabled the Environment Agency to better protect a town of 25,000 from the effects of climate change.

Techniques involved the use of six different drilling / pitting methods including continuous core through the 20m concrete dam